This project consists of design for three roadways as part of the 2019 Pflugerville Bond Program. These three roadways include Picadilly Drive (Central Commerce to IH 35 frontage road – 3,098 linear feet), Royston Lane (Grand Avenue Parkway to Central Commerce – 3,115 linear feet), and Central Commerce (City limits to Picadilly Drive – 2,113 linear feet).
A previous phase of this project included a preliminary schematic design and build application process for federal funding via TxDOT.
The scope of services includes plan and profile of the roadways, pedestrian improvements, environmental analyses, preliminary geotechnical analyses, H&H analyses, offsite and roadway storm conveyance analyses, topographical survey, right of way, design survey and SUE.